35 panel upgrades
A multi-site upgrade program outside the GTA.

100A to 200A upgrades, subpanels for basements and additions, and 400A–600A services for custom homes — sized properly, permitted with ESA and coordinated with your utility.
We size the service for today and for what’s coming — EV charger, heat pump, hot tub.
New main panel, breakers, grounding and bonding, labelled circuits.
Basements, additions, garages and second floors.
Meter base, mast or underground service work.
We file the notification and book the inspection.
Disconnect and reconnect scheduled with your local hydro.
Homeowners, builders and property managers each need something different from a service upgrade.
Breakers tripping, an old fuse or 100A panel, or planning an EV charger or renovation.
200A–600A services on new custom homes, temporary construction power and subpanel layouts from your drawings.
Three-phase panels, transformers, multi-meter bases and multi-site upgrade programs.
A multi-site upgrade program outside the GTA.
600A, 240V underground services on brand-new homes.
Main panel plus subpanels on the second floor and in the basement.
It depends on your existing service, panel location and utility requirements. We give a fixed, itemized quote after a site visit.
Usually part of one day while the utility disconnects and reconnects the service. We schedule it with you in advance. Timing depends on the project.
Yes. Service upgrades in Ontario require an ESA notification and inspection. As a licensed contractor (#7013769) we handle both.
Often, but not always. We run a load calculation first — sometimes a load-management device avoids a full upgrade.
Tell us about the project and attach drawings or photos. We reply with next steps on business days (Monday to Friday).